The Project
Morecambe Community High School required a Visual solution for their old school hall.
As an experienced provider of Education Solutions, Foresightuk were asked to put forward a solution that would involve the research, planning and implementation of all equipment.
The Solution
The hall was surveyed to ensure the best location for the Electronic screen and projector.
Foresight recommended a powerful 4500 lumens projector situated within 9 metres throw from the screen.
Foresight installed a 6 metre wide Electronic Screen on the rear wall of the hall securely bolted to the ceiling along with extra safety features needed due to the weight of the device.
New power sockets and secure cabling was installed to run the electronic screen and power the projector in the hall.
Working closely with the school deputy head teacher, the system was installed by our team of highly skilled in house engineers and technicians during out of school hours, resulting in zero disruption to the running of the school.
The full installation was completed within a full business day.